Illustration 4.4: Installed PV Power
Enter the amount of installed PV power for
each of the PV inputs. When two or more PV
inputs are connected in parallel, each PV in-
put in the parallel group must be set to the
total amount of PV power installed to that
group divided by the number of parallel in-
puts. See the table below for examples of in-
stalled PV power.
Illustration 4.5: Select Country
The display will now show “Select country”.
The country is set to “undefined” at initial
start-up. To select country press 'OK'. Press
to scroll down through the list of coun-
tries. Select the country in which the inverter
is installed by pressing ‘OK’. To meet medi-
um voltage grid requirements select a coun-
try option ending in MV. It is very important
that the correct country is chosen.
Illustration 4.6: Confirm Country Selection
Confirm the choice by selecting the country
again and press 'OK’. The settings for the
chosen country have now been activated.
The inverter only complies with local and national standards provided the correct
country has been selected. If a different country than the one the inverter is in-
stalled in is chosen it can have serious consequences.
4. Start-up and Check of Settings
20 8000038781_00_BAL_en / L00410564-01_02
4
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 32 33

Comments to this Manuals

No comments