Protect PV - Solar InvertersInstallation ManualAEG Power Solutions GmbHRevision: 01Date: 2011-05-25Installation Manual8000038781_00_BAL_en
Illustration 3.1: Safe DistancesObserve these distances when installing one or more inverters. One row mounting is recom-mended. Contact the
3.2. Mounting the InverterFor the safe handling of the inverter, two people must carry the unit, or a suitabletransport trolley must be used. Safety b
Illustration 3.5: Place Inverter in MountingBracketPlace the lower part of the inverter againstthe mounting bracket.Illustration 3.6: Fast
Removal is performed in the reverse order of mounting. With a firm grip at the lower end of theinverter, lift the inverter approximately 20 mm vertica
Illustration 3.8: Open the InverterPush the front cover upwards. When a slightresistance is felt, give the front cover a tapon the bottom t
Illustration 3.10: Fasten Front Screws and En-sure Proper PE Connection.The two front screws are the PE connection to the front cover
Illustration 3.11: AC Cable Wire StripLegend1 Blue cable - Neutral2 Yellow/green cable - EarthThe illustration shows the stripping of insulation of al
6. The Protective Earth wire (PE) is mandatory and must be connected directly to thechassis PE terminal. Insert the wire and fasten the s
When unmated the MC4 connectors are not IP54. The intrusion of moisture mayoccur in the following situations:1. The inverter runs in Master/Slave op
4. Start-up and Check of Settings4.1. Start-up and Check of SettingsNote: Due to the advanced functionalities of the inverter, it may take up to 10 se
Contents1. Safety and Conformity2Safety Information 2Hazards of PV Systems 3PV Load Switch 3Conformity 4Approvals and Certifications 42. Introduction5
Illustration 4.2: Set TimeSet time as prompted by the display. Press'OK' to select number. Press ‘ ▲ ’ to scroll upthrough the numb
Illustration 4.4: Installed PV PowerEnter the amount of installed PV power foreach of the PV inputs. When two or more PVinputs are connected in
Note: If the two country selections do not match they will be cancelled and it will be necessary toredo the selections. If a wrong country is accident
of larger networks. Replication can be performed once, prior to defining the country setting infollower inverters.Illustration 4.7: Master ModeTo ena
5. Technical Data5.1. Technical DataNomen-cla-ture 1)ParameterProtect PV10 kWProtect PV12.5 kWProtect PV15 kW AC Pac,rMax./Nom. power AC 10000 W
1) According to FprEN 50524.2) For fixed systems with semi-optimal conditions.3) At identical input voltages. At unequal input voltages, Vmppmin can b
Parameter SpecificationTemperature -25°C - +60°C (>45°C derating)Environmental class according to IEC IEC60721-3-33K6/3B3/3S3/3M2Air quality ISA S7
Illustration 5.1: Protect PV 10 kW Cable Losses [%] versus Cable Length [m]Illustration 5.2: Protect PV 12.5 kW Cable Losses [%] versus Cable Length [
- Layout type (inside wall, under ground, free air etc.)- UV resistanceIllustration 5.4: Overview of Inverter with Torque IndicationsParameterScrewdri
5.1.2. Wiring DiagramIllustration 5.5: Typical Installation5. Technical Data 28 8000038781_00_BAL_en / L00410564-01_02 5
1. Safety and Conformity1.1. Safety InformationAll persons installing and servicing inverters must be:• Trained and experienced in general safety rule
5.1.3. Auxiliary Interface SpecificationsParameter Parameter details SpecificationSerial Communication RS485Common cable specificationCable jacket d
1) Max. number of inverters are 100. If GSM modem is used for portal upload, the amount of inverters in anetwork is limited to 50.2) For outdoor use,
5.1.4. RS485 Communication Board ConnectionsIllustration 5.7: RS485 Detail of Communication Board.BIAS L and Bias H are to be connected to RX/TX B and
Lit. No. L00410564-01_02 Rev. date 2011-05-25France & AfricaAEG Power SolutionsZI 10 rue Jean Perrin37173 Chambray-lès-ToursTel: + 332 47 80 88
Before installation:Check for damage to inverter and packaging. If in doubt, contact the supplier be-fore installing the inverter.Installation:For opt
1.4. Conformity1.4.1. Approvals and CertificationsFor more information, go to the download area at www.aegps.com/solarinverters, Approvalsan
2. Introduction2.1. IntroductionThis manual explains the installation and setup of the Protect PV solar inverter, for the installa-tion technician.Ill
Protect PVvariantUser interface Ancillary services DC power rat-ing Local Web Server Power Level Adjust-ment,Primary FrequencyControlRide Through Fau
2.1.2. Overview of InverterIllustration 2.3: Overview of AEG PS Protect PV inverterLive Part1. AC Connection Area2. DC Connection Area3. Terminal bloc
3. Installation3.1. Installation Dimensions and PatternsNote: When choosing the installation place, ensure that all labels are visible at all times.Fo