Observe the following criteria here:
The yellow and green wires may not be confused for the continuity
A functional earth (potential equilizer rail) is to be installed
The lightning ducturs are to be installed near to the functional earth so that the
search current is discharged along a short path to the building earth. The line to the
functional earth is to be kept as short as possible with a cross-section of at least 6
mm
2
A maximum of 6 overhead lines can be protected with on system field bus