AEG EHBZDM User Manual Page 32

  • Download
  • Add to my manuals
  • Print
  • Page
    / 36
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 31
12.2 Installing the oven under
a work surface
Installation into flammable
material must agree with
NIN SEV 1000 (Swiss
Association of the Cantonal
Fire Insurance Companies)
fire protection guidelines
and regulations.
A = appliance, N = recess
1. Install the hob according to the
installation instruction number
374307900 / 374307901.
Before insert the oven into cabinet's
recess make sure to carry out the
hotplate socket and use the correct
socket connections. There is no need
to use a separate earthing.
2. Use the side handles to hold the
oven and slide it flush into the recess.
Make sure the cable is free when you
slide the appliance.
N 560-568 mm
115 mm
20
mm
442 mm
180
mm
A 595
mm
N 600
mm
A 592 mm
A 567
mm
N min.
550 mm
~50 mm
A A
B
3. Use a minimum of 2 screws to attach
the oven on the 2 sides (A).
When installing next to a wood-
fuelled boiler, a heatproof and heat-
insulating plate must be mounted at
the height of the appliance and at
least 30 cm deep.
A B
A
min. 20 mm
10
mm
20 mm
12.3 Electrical connection
WARNING!
If service is required always
disconnect the appliance
from the power supply.
Use a power cable of H05VV-F or higher.
Install the appliance with a socket supply
line. If there is no socket supply line, the
fixed home electrical system must
include an isolating device with at least a
3 mm-contact separation to enable a
simultaneous and all-pole cut off from
the mains (according to NIN SEV 1000).
The customer must have a socket for the
electrical connection that is accessible
and outside the coordination room. The
length of the connection cable must be
approximately 120 cm with lines
connected directly to the mains.
Only a qualified person can
connect the appliance to the
electricity supply.
1. Do the electrical connections as in
the connection illustration.
Voltage: 400V
L2
L3
400V
L1PE
400V 3~
L2
400V
L1PE
400V 2~
1 2 3
45
1 2 3
45
2. Secure the cable grip.
www.aeg.com
32
Page view 31
1 2 ... 27 28 29 30 31 32 33 34 35 36

Comments to this Manuals

No comments