AEG 61000M Operations Instructions Page 31

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 30
31
6.2 Set-up and Installation of the Modules
1. To set up the unit, position it in its installation
location and use a spanner to turn the height-
adjustable feet until they reach the floor. The feet
are located at the four corners of the baseplate.
2. Push the communication module into the top left-
hand corner of the uppermost slot (see illustration
above).
3. Push all PROTECT 1.040 UPS modules into the
slots one after the other in order to complete
installation of the modules (see illustrations below).
Note: You must install the modules one after the other. Only
once one module has been engaged completely in the frame
can the next one be installed.
Bra ke p a d
Locking foot
Page view 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 55 56

Comments to this Manuals

No comments