5 Commissioning
5.1 Deployment
The UPS was constructed for both horizontal / flat (rack/19")
operation and vertical / standing (tower) operation.
Operation the unit for longer time above an
ambient temperature of 25° C reduces the lifetime
of the batteries.
Position the UPS unit at least 20 cm away of any
other electronic equipment to prevent
interference.
After deployment and assembly of the UPS follow the steps
for activation as explained in chapter 5.4
5.1.1 Tower (Stand alone deployment)
All models are qualified for stand alone use. PROTECT B. 750
and 1000 consist each of only one component and can be set
up either standing or lying position
PROTECT B. 750 / 1000 standing and lying
PROTECT B. 1500 and 2000 are operated always in
combination with at least one additional battery module.
Because of the air intake in the front and the rear there is a
variety of deployment positions.