AEG ARE I2 Operations Instructions Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 42
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
"UniVert 2" inverter
Page 26 of 42 8000012364 BAL, en
Switchover with gap:
The switchover from INV to SBS is carried out without interruption if
the INV and SBS circuit are synchronous. If the INV and SBS circuit
are not synchronous, the SBS does not block in this operating mode.
If the INV is switched off due to asynchronism or if it fails, the load is
supplied by the SBS after a load voltage gap of 140 ms.
i
NOTE:
If the operating mode "Switchover with gap" is selected, the
connected loads must be able to withstand a gap of 140 ms and a
phase shift that might follow.
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 41 42

Comments to this Manuals

Arthur Norbisrath 02 Apr 2024 | 23:47:35

Hello trying to locate a table that defines the recommended servicing of A 60 KVA UPS system? 5.33/xxx-220 25KVA - 120kva Regards Arthur Norbisrath Snowy Hydro Australia Email. [email protected]