AEG DDLE Basis 13 Operations Instructions Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 17
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
28
!LTERNATIVEINSTALLATIONMETHODSARESHOWNINlGURES
J

O
4.1 Power supply – unfinished walls - below
K
a Push the cable grommet (4) over the power cable.
b Break out the cable grommet knock-out in the back panel.
c Move the terminal strip from the top to the bottom; for this, undo the screw and refit it into the terminal
strip moved to the bottom.
d Slide the back panel over the studs and the cable grommet, pull the cable grommet with a pair of pliers
against the locking hooks and let both hooks audibly click into place.
e Push the back panel firmly and flush against the wall and lock with the fixing toggle (11).
4.2 Power supply – finished walls
s #UTBREAKAHOLEINTOTHEBACKPANELSUITABLEFORTHEPOWERCABLEFORPOSSIBLEKNOCKOUTSSEE
J
).
s 7ITHPOWERSUPPLYONlNISHEDWALLSTHEPROTECTIONRATINGISREDUCEDTO)0SPLASHPROOF
0LEASENOTE
Mark the type plate with a permanent marker:
Cross out IP 25 and tick the IP 24 box.
4.3 Priority control
L
When used in conjunction with other electrical equipment, e.g. electric storage heaters, use the maximum
demand relay:
a Maximum demand relay (see “8. Special accessories”).
b Control cable to the contactor of the second device (e.g. electric storage heater).
c Control contact, opens when switching the instantaneous water heater on.
4HERELAYTRIPSASSOONASTHEINSTANTANEOUSWATERHEATERSTARTS
/NLYCONNECTTHEAUTOMATICMAXIMUMDEMANDCONTROLLERTOTHECENTRALPHASEOFTHEEQUIPMENTTERMINALS
MAINSPOWER
4.4 Undersink installation, water connections from the top
Undersink installation with water connections from the top can be achieved with the additional pipe assembly
for undersink devices (part no. 18 44 21). Cleanly break out the water pipe knock-outs in the back panel and
fit the pipe set.
4.5 Temperature limit
If the maximum temperature is to be limited to 43 °C, this is done on the inside of the
device cap. For this, replug the temperature selector cable in the device cap from 60 °C
to 43 °C. You can still adjust the temperature selector across its entire range. The outlet
temperature will be permanently limited to 43 °C. A temperature range 30 °C to 43 °C
can be selected.
4.6 Taps for finished walls
!%'(AUSTECHNIKPRESSURETESTEDTAPFORlNISHEDWALLS
!$%O7$
N
(part no. 18 39 34):
s &ITPLUG'WITHGASKETSA
(part of the standard delivery of the pressure tested tap ADEo 70 WD).
s &ITTHETAP
s 0USHTHEOPENENDOFTHEPIPESINTOTHEVALVE
s #LICKTHELOWERPARTOFTHEBACKPANELINTOTHEUPPERPARTOFTHEBACKPANEL
s 3ECURETHECONNECTIONPIPESONTHEDEVICE
4HEDEVICECAPNEEDSTOTHEPREPAREDTORTHISINSTALLATION
Cleanly break out the knock-outs in the device cap (
M
a), use a file, if necessary.
$EVICElXING
Secure the back panel in the lower part of the device with two additional screws (
M
25).
#APINSTALLATION
Hook the device cap at the top and pivot it down onto the back panel, then make it audibly click into
place. Check the firm seat of the device cap on the back panel.


For contractors
4. Alternative installation methods for contractors
Power supply: unfinished walls - below, maximum demand relay; undersink installation, water
connections - top; water: finished walls
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 17

Comments to this Manuals

No comments