AEG 66000I User Manual

Browse online or download User Manual for Unknown AEG 66000I. Flight Standardization Board (FSB) Report GIV-x, G-V

  • Download
  • Add to my manuals
  • Print
  • Page
    / 149
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
FLIGHT STANDARDIZATION BOARD (FSB) REPORT
(Revision 8)
GULFSTREAM GIV-X (G350/G450)
GULFSTREAM G-V
GULFSTREAM GV-SP (G500/G550)
APPROVED:
__________ DATE 08/01/2012
Mark A. Humphreys
Chairman, GIV-X/G-V/GV-SP Flight Standardization Board
Federal Aviation Administration
Aircraft Evaluation Group (LGB AEG)
3960 Paramount Boulevard, Suite 100
Lakewood, CA 90712-4137
Telephone: (562) 627-5317
FAX (562) 627-5281http://www.faa.gov/about/office_org/field_offices/aeg/lgb_aeg/
CONTENTS
Page view 0
1 2 3 4 5 6 ... 148 149

Summary of Contents

Page 1 - GULFSTREAM G-V

FLIGHT STANDARDIZATION BOARD (FSB) REPORT (Revision 8) GULFSTREAM GIV-X (G350/G450) GULFSTREAM G-V GULFSTREAM GV-SP (G500/G550) APPROVED:

Page 2

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 1.6 This report also provides: 1.6.1 Minimum pilot training, checking and currency require

Page 3

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (f) (g) envi

Page 4

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding computation of fuel

Page 5

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (b) (c) (d)

Page 6

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 6 - HEAD-UP DISPLAY (HUD) SYSTEMS Flight crewmember training must be accomplished usi

Page 7

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 9) TCAS resolution advisory 10) Takeoff using the FPA to meet a required climb gradient. Che

Page 8 - PURPOSE AND APPLICABILITY

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 APPENDIX 7 – KOLLSMAN ENHANCED VISION SYSTEM (EVS) EVS meets the requirements of EFVS (Enhan

Page 9

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 2) Crew briefings and callouts including annunciation of published minima and operation below

Page 10

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 The GV-SP and GIV-X EVS were evaluated by the FSB and have been found to be functionally equiv

Page 11

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 8 – GIV-X OPERATING RULES COMPLIANCE CHECKLIST Serial number 4003, was utilized by th

Page 12

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding * SUBPART A - GENE

Page 13

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 FTD Flight Training Device GAC Gulfstream Aerospace Corporation HUD Honeywell Head Up

Page 14

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91. 23 (a) (b)

Page 15

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.129 91-234 Ope

Page 16

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.175 91.267 Ta

Page 17

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding * SUBPART C - EQUI

Page 18

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.207 (a) (b

Page 19

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.215 (a) (

Page 20

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.223 (a) (b

Page 21

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.401 Applicabil

Page 22

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.417 (a), (b),

Page 23 - Reserved

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.509 Survival

Page 24 - Appendix 1 - MDR TABLE

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 aircraft hardware interface. In addition a newly manufactured simulator, which was under devel

Page 25

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.517 (a) (b)

Page 26

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.535 Stowage o

Page 27

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.611 Authoriza

Page 28

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.811 Service

Page 29

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.905 91-227 Li

Page 30 - MANEUVER

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135. 23 (a) (b)

Page 31 - SYSTEM

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135. 25 (a) (b)

Page 32

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.81 (a) (

Page 33

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (a) (b) Unpressu

Page 34

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.109 Pilot in

Page 35

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 then received differences training in the variant airplane and underwent pilot proficiency che

Page 36

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.149 (a) (b)

Page 37

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.152 (a)

Page 38

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.153 (a) (

Page 39

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.157 (a)

Page 40

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.161 (a) (

Page 41

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.169 135-55 A

Page 42

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.177 135-80 Eme

Page 43

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.227 135-60 I

Page 44

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.324 135-67 T

Page 45

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.369 Large t

Page 46

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 checking and currency requirements are listed in Appendix 10 1.9.9 In April and November 200

Page 47

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.381 Large

Page 48

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.398 Commuter

Page 49

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.427 135-66 Man

Page 50

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 9 - PLANEVIEW AVIONICS SOFTWARE VERSION “C” PlaneView Avionics Software version “C”

Page 51

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 10 - PLANEVIEW AVIONICS SOFTWARE VERSION “D” PlaneView Avionics Software version “D”

Page 52

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 11 - PLANEVIEW AVIONICS SOFTWARE VERSION “E” PlaneView Avionics Software version “E”

Page 53

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 12 - PLANEVIEW AVIONICS SOFTWARE VERSION “F” The PlaneView Avionics Software version

Page 54

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Table 1 – Training Differences FROM TO (1) TRAINING LEVEL Cert “F” (Basic Load) A Cert “F” w

Page 55

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 13 - PLANEVIEW AVIONICS SOFTWARE VERSION “G” PlaneView Avionics Software version “G”

Page 56

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 14 - G-V DISPLAY UNIT DU-885 MODIFICATION The DU-885 modification changes the G-V as

Page 57

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 the associated AFM change, was found to be operationally suitable. Training checking and curre

Page 58

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 synoptic and system pages have been made. 3.1.6 Navigation and Communication: All three air

Page 59

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 Above 165 Kts. 3 Miles 3.1.10 Approach Profiles and Speed: The approach profiles are the s

Page 60

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 approval from their POI of specific ODR tables pertinent to their fleet. The POI should coordi

Page 61

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 procedures that are required for the original issuance of the pilot certificate. 6

Page 62

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 PURPOSE AND APPLICABILITY...

Page 63

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 7.1.2 The following areas of emphasis must be demonstrated during checking: a. Proficiency i

Page 64

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 listed or addressed. It continues to be the responsibility of the CHDO to review compliance wi

Page 65

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 10 FSB SPECIFICATIONS FOR DEVICES AND SIMULATORS 10.1 Device and Simulator Characteristics:

Page 66

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 13 MISCELLANEOUS Reserved 14 SUPPLEMENTAL BOARD REPORT - PART II 14.1 Part II of the

Page 67

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 Appendix 1 - MDR TABLE

Page 68

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 Master Differences Requirements From Airplane Airplane Type Rating: GV GV-SP GV GIV-X

Page 69

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 Appendix 2 - ACCEPTABLE ODR TABLES

Page 70

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 Definitions ODR Training Level “HO” = Handout A “ST” = Slide/tape presentations “TCBI” = Tu

Page 71

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GV-SP BASE AIRCRAFT: GIV-X APPROVED BY (POI)___________________

Page 72

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GV-SP BASE AIRCRAFT: GIV-X APPROVED BY (POI)___________________

Page 73

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 APPENDIX 13 - PLANEVIEW AVIONICS SOFTWARE VERSION “G”...

Page 74

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GV-SP BASE AIRCRAFT: GIV-X APPROVED BY (POI)___________________

Page 75

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GV-SP BASE AIRCRAFT: GIV-X APPROVED BY (POI)___________________

Page 76

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GIV-X BASE AIRCRAFT: GV-SP APPROVED BY (POI)___________________

Page 77

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GIV-X BASE AIRCRAFT: GV-SP APPROVED BY (POI)___________________

Page 78

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GIV-X BASE AIRCRAFT: GV-SP APPROVED BY (POI)___________________

Page 80

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GIV-X BASE AIRCRAFT: GV-SP APPROVED BY (POI)___________________

Page 81

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GV BASE AIRCRAFT: GIV-X APPROVED BY (POI)_______________________

Page 82

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GV BASE AIRCRAFT: GIV-X APPROVED BY (POI)__________________________

Page 84

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 REVISION RECORD Revision No. Section Page #s Date Original All All 7/21/97 1

Page 85

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GV BASE AIRCRAFT: GIV-X APPROVED BY (POI)_______________________

Page 86

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 DIFFERENCE AIRCRAFT: GV BASE AIRCRAFT: GIV-X APPROVED BY (POI)_______________________

Page 87

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: GIV-X BASE AIRCRAFT: GV APPROVED BY (POI)________________________

Page 88

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: GIV-X BASE AIRCRAFT: GV APPROVED BY (POI)________________________

Page 89

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: GIV-X BASE AIRCRAFT: GV APPROVED BY (POI)_______________________

Page 90

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: GV-SP BASE AIRCRAFT: G-V APPROVED BY (POI)________________________

Page 91

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: GV-SP BASE AIRCRAFT: G-V APPROVED BY (POI)________________________

Page 92

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: GV-SP BASE AIRCRAFT: G-V APPROVED BY (POI)________________________

Page 93

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: GV-SP BASE AIRCRAFT: G-V APPROVED BY (POI)________________________

Page 94

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: G-V BASE AIRCRAFT: GV-SP APPROVED BY (POI)_________________________

Page 95

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 5 Appendix 5 71, 79, 97 05/05/08 5 Appendix 6 104 05/05/08 5 Appendix 7 105-1

Page 96

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: G-V BASE AIRCRAFT: GV-SP APPROVED BY (POI)________________________

Page 97

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: G-V BASE AIRCRAFT: GV-SP APPROVED BY (POI)_________________________

Page 98

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 DIFFERENCE AIRCRAFT: GV-SP BASE AIRCRAFT: G-V APPROVED BY (POI)________________________

Page 99

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 3 - TRAINING PROGRAM SPECIAL EMPHASIS ITEMS The FSB has identified several aircraft

Page 100

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 The FSB also found that early exposure to the FGS and FMS is important, especially for pilots w

Page 101

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 4 – G-V OPERATING RULES COMPLIANCE CHECKLIST The first production aircraft, serial n

Page 102

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 91 - GENERAL OPERATING AND FLIG

Page 103

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 91 - GENERAL OPERATING AND FLIG

Page 104

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 91 - GENERAL OPERATING AND FLIG

Page 105

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 91 - GENERAL OPERATING AND FLIG

Page 106

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 HIGHLIGHTS OF REVISION 8 CHANGES The primary purpose of this revision is to document the FSB

Page 107

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 91 - GENERAL OPERATING AND FLIG

Page 108

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 91 - GENERAL OPERATING AND FLIG

Page 109

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 135 – COMMUTER AND ONDEMAND OPE

Page 110

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 135 – COMMUTER AND ONDEMAND OPE

Page 111

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 135 – COMMUTER AND ONDEMAND OPE

Page 112

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 135 – COMMUTER AND ONDEMAND OPE

Page 113

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 135 – COMMUTER AND ONDEMAND OPE

Page 114

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 135 – COMMUTER AND ONDEMAND OPE

Page 115

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 135 – COMMUTER AND ONDEMAND OPE

Page 116

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAA OPERATIONAL REQUIREMENTS/COMPLIANCE for Gulfstream G-V PART 135 – COMMUTER AND ONDEMAND OPE

Page 117

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 MANAGEMENT COORDINATION SHEET /s/ 4/20/2012 Eugene F. Huettner Date: Manager, LGB AEG Lo

Page 118

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 Appendix 5 – GV-SP OPERATING RULES COMPLIANCE CHECKLIST Serial number 5001, was utilized by t

Page 119

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding * SUBPART A - GENE

Page 120

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (b) (c) (d)

Page 121 - Demonstrated

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.127 91-239 Ope

Page 122

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.177 Minimum A

Page 123

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (d) Compliance w

Page 124

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.207 (a) (b

Page 125

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (d) operation

Page 126

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.299 * SUBPART D

Page 127

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.407 Operation

Page 128

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 PURPOSE AND APPLICABILITY 1.1 The Gulfstream GIV-X, G-V, and GV-SP are listed on FAA Type C

Page 129

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (a)(3) & (a

Page 130

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 91.513 (a) (b)

Page 131

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding during outfitting a

Page 132

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding computer for takeof

Page 133

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding designated as Reduc

Page 134

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding to 14 CFR part 36 S

Page 135

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding * SUBPART A - GENE

Page 136

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (k) (l) (m)

Page 137

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.69 Restricti

Page 138

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (e) Cargo compa

Page 139

GIV-X / G-V / GV-SP FSB Report Part I, Rev. 8 8/1/12 1.5 This report also addresses certain issues regarding the operation of the GIV-X, G-V, an

Page 140

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding Responsibility Resp

Page 141

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (b) (c) Requ

Page 142

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding Recording duration

Page 143

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (d) (e) (f) Oper

Page 144

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (b) Extension

Page 145

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (i) Continuous inf

Page 146

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.175 (a) (b)

Page 147

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.213 135-60 Weat

Page 148

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding 135.295 Initial

Page 149

GIV-X / G-V / GV-SP FSB Report Part I, Rev.8 8/1/12 FAR Amdt. Requirement Gulfstream Position Gulfstream Remark FSB Finding (b) (f) Each cer

Comments to this Manuals

No comments